Telstra Data Centre – Parramatta, Sydney

Projects Fitout Telstra Data Centre – Parramatta, Sydney

Renascent was engaged to manage and construct Telstra Data Centre – a complex and technical project that was separated into two areas, a technical equipment room and an office space.

The technical stage involved the installation of eight process cooling units, access flooring and a multi-level cable tray at both high and low level, eight automatic transfer switchboards and twelve distribution switchboards; and two 200KVA uninterrupted power supplies. The office space and foyer was an upgrade of the existing area. Renascent worked closely with the client to ensure the intricate project was completed successfully and on time.

 

Location
Parramatta, Sydney

Delivery Method
Construction Management

Client
Telstra

Value
$2.5

Floor Area
1400 m2