HCF House

Address | Levels 5-8, 403 George Street, Sydney NSW

Project Budget | $18m

Area | 3680m²

Designer | WMK Architecture

HCF House project involved the strip out and refurbishment of 4 floors, including slab penetrations to form a new bespoke staircase from level 5 to 8.

The fitout involved workspace zones, including sit to stand workstations, quiet rooms and breakout areas, and meeting rooms with the facility to video conference. The works on the executive floor (level 8) consisted of high-end veneered joinery finishes, and stone flooring to the stair core and lift lobby. The boardroom, conference and training rooms each contained bespoke joinery ceilings.

A full service upgrade, including lift lobbies and core bathrooms were received on all four levels. In addition, the existing glazed façade was also replaced on each floor.

The works were successfully carried out whilst the client occupied the levels above and below.